NE 192nd St Sidewalk, Bike Lane & NE 192nd St Culvert Replacement

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Location

 NE 192nd St from 73rd Ave NE to 75th Ave NE

Schedule

Design: Design is expected to begin first quarter of 2024.

Construction: Construction is expected to start in 2027

Project Description

The goal of this project is to provide a new sidewalk along NE 192nd St from 73rd Ave NE to 75th Ave NE.  Along with the sidewalk, there will a be reduction in pedestrian crossing at NE 192nd and 75th Ave NE by adding intersection curbing and reducing the radii. A new school zone flashing beacon will also be added.  This project will also include a culvert replacement between 73rd Ave NE and 75th Ave NE.  See the image for more information on exact locations

 

Funding

Safe Routes to School, Local, and Surface Water

Road Sections

192nd St Road Diagram

Site Photos

192nd St Photo 2

tire

 NE 192nd St. Culvert Replacement

Funding

Federal Community Projects and Surface Water funds

Schedule

Design: Design is expected to begin third quarter of 2024.

Construction: Construction is expected to start in 2027

Location

NE 192nd St near the 7400 block

Description

The Culvert Replacement project is a Surface Water project that the City of Kenmore is tying together with the NE 192nd St sidewalk project to reduce cost and impact to the neighborhood.  The current culvert is an existing concrete pipe that is not ‘fish passable.’  The project with replace the culvert near the 7400 block of NE 192nd St. with a fish-passable culvert that will include wingwalls, headwalls, pavement restoration and public utility relocations. To facilitate construction of this culvert, NE 192nd St will be closed to through traffic at the culvert location.  As the project progressing through the design phase, more information on the project and the impacts will be shared with the neighborhood. 

 

For more information on Surface Water and Culverts click here