NE 192nd St Sidewalk, Bike Lane & NE 192nd St Culvert Replacement
Location
NE 192nd St from 73rd Ave NE to 75th Ave NE
Schedule
Design: Design is expected to begin first quarter of 2024.
Construction: Construction is expected to start in 2027
Project Description
The goal of this project is to provide a new sidewalk along NE 192nd St from 73rd Ave NE to 75th Ave NE. Along with the sidewalk, there will a be reduction in pedestrian crossing at NE 192nd and 75th Ave NE by adding intersection curbing and reducing the radii. A new school zone flashing beacon will also be added. This project will also include a culvert replacement between 73rd Ave NE and 75th Ave NE. See the image for more information on exact locations
Funding
Safe Routes to School, Local, and Surface Water
Road Sections
Site Photos
NE 192nd St. Culvert Replacement
Funding
Federal Community Projects and Surface Water funds
Schedule
Design: Design is expected to begin third quarter of 2024.
Construction: Construction is expected to start in 2027
Location
NE 192nd St near the 7400 block
Description
The Culvert Replacement project is a Surface Water project that the City of Kenmore is tying together with the NE 192nd St sidewalk project to reduce cost and impact to the neighborhood. The current culvert is an existing concrete pipe that is not ‘fish passable.’ The project with replace the culvert near the 7400 block of NE 192nd St. with a fish-passable culvert that will include wingwalls, headwalls, pavement restoration and public utility relocations. To facilitate construction of this culvert, NE 192nd St will be closed to through traffic at the culvert location. As the project progressing through the design phase, more information on the project and the impacts will be shared with the neighborhood.